Q065- Mary MacKillop Penola GLA - सार्वजनिक प्रोजेक्ट साइट
-
16th जुलाई 2025, Traffic flow and Site parking
Hi All, Please ensure all road rules and site signage are followed. Speed limit is to be UNDER 10 KMH.
Please make sure that you are not parking on the site compound. All parking is to be in the nominated contractor area. -
26th फरवरी 2025, Daily Hazard Report
Daily Hazard Report
Excavations
- Open Trenches
- Mobile Plant Movements
- Slips, Trips and Falls
Footing steel install
- Slips, Trips, Falls
- Manual Handling
- Working around loose edges.
- Metal cutting eye protection
- Sharp metal cut edges.
Ensure correct lifting techniques
Take 5 before starting activities
Ensure relevant SWMS are signed prior to commencing works
साइट का मौजूदा मौसम
अंतिम बार अपडेट किया गया: 19:31
तापमान: 24C (ऐप 21C)
हवा की गति: 17KMH
अधिकतम हवा: 28KMH @13:21
सुबह 9 बजे से बारिश: 0.0mm
न्यूनतम तापमान: 14C @03:28
अधिकतम तापमान: 28C @14:09
गस्ट: 20KMH
अधिकतम गस्ट: 32KMH @13:21
ऑब्जरवेशन की लोकेशन- Toowoomba, QUEENSLAND
समय क्षेत्र - ऑस्ट्रेलियाई पूर्वी मानक समय
पूर्वानुमान - शुक्रवार, 17 अप्रैल
Sunny.
न्यूनतम: 13C अधिकतम: 28C
बारिश की संभावना: 5%
पूर्वानुमान वाली लोकेशन - Toowoomba, QUEENSLAND
समय क्षेत्र - ऑस्ट्रेलियाई पूर्वी मानक समय
कल - शनिवार, 18 अप्रैल
Sunny.
न्यूनतम: 12C अधिकतम: 26C
बारिश की संभावना: 5%
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।
क्या आप इस साइट के लिए आवश्यक PPE के बारे में जानते हैं?
सुनिश्चित करें कि आपके पास साइट पर पहले दिन के लिए सही सुरक्षा इक्विपमेंट हैं।
जब आप साइट पर पहुंचें, तो जल्द से जल्द काम करना शुरू कर दें।
अपनी सुविधा के अनुसार अपना साइट रजिस्ट्रेशन ऑनलाइन पूरा करें और अपना समय बचाएँ।